COD GALBEN: 28-11-2021 ora 11 Intre 28 noiembrie, ora 20 – 29 noiembrie, ora 10 se va semnala intensificări ale vântului, ninsoare viscolită în Carpații Meridionali la altitudini de peste 1700 m COD GALBEN: 29-11-2021 Intre 02:00 si 08:00 se va semnala intensificări locale ale vântului cu viteze la rafală de 55...75 km/h in Județul Braşov, Județul Sibiu;

Click pe fotografie pentru a o mari
Descriere: epa09605420 Workers at the China Communications Construction Company (CCCC)-run construction yard in the town of El Triunfo, municipality of Balancan, in Tabasco, Mexico 25 November 2021 (issued 26 November 2021). The Maya Train project, one of the flagship works of the Government of Mexican President Andres Manuel Lopez Obrador, has been delayed by at least five months due to bureaucracy and geological faults, as revealed on 26 November by the general director of the National Fund for the Promotion of Tourism (Fonatur), Rogelio Jimenez. CCCC and Mota-Engil won the Mayan Train contract. EPA/Manuel Lopez
Cuvinte cheie:
ID fotografie: 15133865
Autor: Manuel Lopez
Credit:
Redactor: EPA
Locatie: El Triunfo - Mexico
Dimensiune: 2429 x 1605 px
Realizat: 2021-11-26
Introdus: 2021-11-26 18:49:47
 Eveniment
 Autor
 Data
Monitorizare
Setări

DETALII DESPRE TINE

Dacă ai cont gratuit te loghezi cu adresa de email. Pentru a crea un cont gratuit accesează secțiunea “Crează cont”.

Dacă ai cont plătit te loghezi cu username. Pentru a vă crea un cont plătit vă rugăm să contactați:

Dacă nu puteți vizualiza această știre, contactați echipa AGERPRES pentru a vă abona la fluxurile de știri.